Sunday, March 25, 2007

Phase 1 Done

The construction workers are all done with the studio (they still have some clean up to do.) The doors are on and even have door knobs and locks.

The rest is now up to us. Outside, we need to give her a bath, put a porch on, and she needs a skirt and some flowers planted around her. Inside, we are insulating, putting up prettier support beams, building a work bench, sheetrocking, painting, tiling the floor.... lots to do. Really a lot, but I hope to be melting glass SOON.

0 Comments:

Post a Comment

<< Home